72 hours to prove what you have already done
In many subcontracting shops, preparing a traceability file before an audit takes three days of manual reconstruction. The work was done. Proving it is another story.
A certified machining shop receives an audit date. The work of the last six months is good: the parts are compliant, the inspections were carried out, the operators followed the routings. Nobody doubts the quality of what left the shop.
And yet, in the days leading up to it, one or two people almost stop producing to do something else: rebuild the file. Find the travellers, cross-check the batch numbers, track down the material certificate that goes with the right work order, check that the version of the routing used was indeed the one that applied on that day.
The problem is not quality. It is proof.
It is a distinction that often goes unnoticed, because the two merge on audit day. But they are two different things:
- Doing the work properly: this is what the shop knows how to do.
- Being able to show, cold, several months later, that the work was done properly: this is what costs three days.
When traceability lives in a mix of paper binders, Excel files and the memory of two or three key people, proof does not exist continuously. It is rebuilt on demand. And rebuilt proof is fragile: one forgotten line, one overwritten file, one person on leave at the wrong moment is all it takes.
What those 72 hours really say
This preparation time is not a one-off anomaly. It is the symptom of an information system that was designed to record, not to give back. The data exists. It is just scattered, unconnected, and dependent on the people who know where to look.
Three concrete consequences:
- The cost is invisible. These hours are billed to no one, so they show up nowhere. But they are real, at every audit, every customer complaint, every concession request.
- The risk is concentrated. If the person who “knows where things are” leaves, part of the traceability leaves with them.
- Trust is asymmetric. The shop knows it did good work, but can only prove it at the price of a disproportionate effort.
What we take from it
A traceability file should not need preparing. It should already be there, because every production step fed it at the moment it happened, not three months later in a rush.
It is a design problem, not a discipline problem. The shops we meet do not lack seriousness. They lack a tool that turns what they already do into proof available instantly: no re-entry, no reconstruction, no dependence on a single person.
This is exactly the kind of finding that made us start.